Project Categories: Bridges & Platforms Transportation & InfrastructureProject Tags: post tensioning strand cable rod
Bridges, beams, slabs, silos post- tensioning.
Additional-external prestressing.
Installation, tension and grouting services.
Ground and Rock anchors. Holding down bolts for wind turbines.
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
- Work site Engineering
A sub-project of Moniterra (Code: MNTR/NMK01)
Project Status: New
Surveying/Topographical Support for the project: RECONSTRUCTION & DEVELOPMENT (Phase 2) for the basic project of 7 roads routes in NMK
Project Status: New
Γεωμηχανική και Δομητική Παρακολούθηση της κατασκευής του νέου ξενοδοχείου “Όλυμπος – Νάουσα” στην παραλία Θεσσαλονίκης.
Project Status: Ongoing
Phone: +30 6944864909
Relocation of a Roman Monument to the area of Venizelio Hospital of Heraklion, Crete
Project Status: Finished
Installation, inspection, maintenance and replacement services for: Bridge bearings, rubber bearings, pot-bearings Seismic Isolator Devices, Sliders, Velocity Dependent Devices, Displacement
Project Status: Ongoing
Phone: 6937046604